ELEKTROMASH CERTIFIED PRODUCTION OF ENERGY-EFFICIENT ELECTRIC MOTORS

03/26/19 15:22

ELEKTROMASH CERTIFIED PRODUCTION OF ENERGY-EFFICIENT ELECTRIC MOTORS

The Pridnestrovian mechanisms are capable to compete with the leading global manufacturers on the quality and a complete set

Tiraspol, March, 26. /Novosti Pridnestrovya/. The Elektromash Plant continues to develop production of hi-tech electric motors successfully.

In the middle of March samples of new cars successfully passed tests and received certificates of conformity to requirements of technical regulations of the Eurasian Economic Union (EEU) and Ukraine. Electric motors have a high class of energy efficiency and are designed on export to Russia, Ukraine, Kazakhstan, Belarus.

«Electric motors are realized in three lines: for the petrochemical industry, coal and for the common industrial enterprises. They include a large number of types of execution – more than 300 options. Vertical and horizontal, with a different frequency of rotation, power and tension», - the Director of Elektromash Special Design Bureau Maxim Medushevsky explained.

These electric motors do not concede similar products of the leading global manufacturers, at the same time surpass products of producers of the CIS countries and the East. Among advantages of the Pridnestrovian mechanism, there is a high class of energy efficiency and equipment sensors of the frequency of rotation of a rotor, control of temperature and vibration.

«The Russian market only begins to master and release energy efficient mechanisms. In fact, our competitors are far far behind us and cannot offer even something similar to our products», - Maxim Medushevsky paid attention.

In comparison with the European producers in favour of the Pridnestrovian electric motors have a more attractive price for the same level of quality.

By the way, such large Russian oil and gas companies as Rosneft and Bashneft are interested in these electric motors.

 

Также в рубрике

12/12/24 16:37
Heads of state administrations will manage them at the local level
12/12/24 15:38
This will allow for 50 days serving the republic's humanitarian needs for electricity
12/12/24 15:26
Work schedules for enterprises are currently being drawn up
12/11/24 14:12
Moldovagaz and those responsible for energy in the Republic of Moldova should agree on supplies