Inspection of the Central District Hospital in Grigoriopol

11/05/24 11:23

Inspection of the Central District Hospital in Grigoriopol

The Polyclinic in Grigoriopol, which is a structural unit of the Central District Hospital, is undergoing reconstruction. Repair and construction work began in September last year. 6.8 million rubles were allocated under the capital investment program in 2023, and three million more this year. The scope of work is significant. The heating, water supply, and electrical systems were replaced in addition to general construction work. An important task was to install an elevator. It is especially awaited in the medical institution. Vadim Krasnoselsky was convinced of this during the inspection tour when he met a visitor who was climbing the stairs on crutches on the stairwell. The President reassured that the situation would change in the near future. The elevator was installed and is almost ready for commissioning on his instructions.

The renovation of the 3rd and 4th floors of the polyclinic is complete. The premises are furnished and equipped. Work is currently underway on the two lower floors. Vadim Krasnoselsky emphasized that the project must definitely be on the program for next year. Approximately 4 million rubles will be needed to complete the work. The adjacent territory will need to be improved in addition to the renovation of the premises on two floors – paving with tiles and arranging a parking lot. The entrance group will be updated. It was decided that it will remain open, but the ramp will be remade, which Vadim Krasnoselsky noted as inconvenient.

 

Также в рубрике

12/02/24 11:35
The President in the course of the video conference was informed by heads of state administrations about the state of affairs in the cities and districts of the republic. Vadim Krasnoselsky gave current instructions, outlined priority tasks and plans for the future.