The Tiraspol gymnasium and the stadium of school No. 18 are preparing for a major renovation

02/02/21 19:39

The Tiraspol gymnasium and the stadium of school No. 18 are preparing for a major renovation

The Tiraspol Humanitarian and Mathematical Gymnasium is among the objects that the President visited today. The oldest educational institution of the republic will celebrate its 128th anniversary this month. Women's gymnasium, labor school, secondary school No. 6, the Tiraspol Humanitarian and Mathematical Gymnasium, the status and name of the educational institution changed, but its history was formed within the same walls. The buildings of a comprehensive school located in the center of the capital - one of the most numerous in terms of the number of students - require renovation. The volume of work is great, the works are carried out in stages. It was started by means of the Capital Investment Fund last year. Windows were replaced. The heating system has been updated. Five million rubles will be allocated from the Capital Investment Fund this year. The delegation headed by Vadim Krasnoselsky examined the locations, the reconstruction of which is planned as a matter of priority. We are talking about workshops, premises for conducting elementary military training lessons, a small gym and classrooms for primary school students (conducting lessons in the second official and foreign languages, as well as additional classes in subgroups). There are 16 maximum filled primary classes in the gymnasium now. In this regard, the President noted that it is wrong to further increase their number in one educational institution: it is necessary to develop the gymnasium direction in other schools.

The headmaster of the gymnasium during the inspection of the premises spoke about plans for the improvement of the recreation area for children in the place of the current dressing room. The project includes the improvement of the basement floor and the reconstruction of the sector allocated for elementary military training. An important component is the shooting range. This sector will be divided into two zones - waiting and shooting practice. The theory of basic military training will be taught in a separate classroom. It is necessary not only to renovate the premises, but also to equip them: it is necessary to purchase targets and a bullet trap.

The school workshops, large and small will be also reworked. The premises after the overhaul will house the available machines for working with metal and wood. The equipment is being revised now. Natalya Sivakova said that in recent years, young men have shown an increased interest in joinery and plumbing, as well as modeling. Vadim Krasnoselsky noted that the desire of young people to master applied professions should be fully supported and encouraged, creating conditions for practical training. The President assigns an important role in this matter to teacher-mentors, whose skill and involvement determines the child's interest in learning and obtaining practical skills.

The small gymnasium, designed for physical education for junior and middle-level schoolchildren, will also be renovated this year. In addition, it is planned to host basketball, volleyball and pioneerball competitions.

The President examined catering unit. Its renovation and refurbishment is planned for 2022.

Another object related to the school environment, of those that the President visited today, is the stadium near the school number 18. Residents of the microdistrict talk about the necessity for its improvement for a long time. Now it looks more like a wasteland. An open sports complex is to be created on its basis. They will equip a football field, basketball and volleyball courts, a workout area and running tracks to begin with. This is the challenge for this year. If we start work in March-April, then by September the facility will be commissioned, the Head of Tiraspol administration Oleg Dovgopol assured the President. Vadim Krasnoselsky is sure that this object is extremely necessary, and the project cannot be postponed. The President noted that the complex can be gradually developed and expanded based on the needs of the population in the future.

 

Также в рубрике