Moldova Steel Works (MSW) started production

03/10/15 11:38

Moldova Steel Works (MSW) started production

Today, the metal was melt for the first time after the enterprise's nationalization

The Pridnestrovie's President Evgeny Shevchuk, the Prime Minister Tatyana Turanskaya, the representatives of the state authorities attended ceremony of the production start-up.

Now, the republic's leaders hold a meeting with the MSW staff.

To be noted that all of the MWS's sections were configured and adjusted through the dry run after the repair works and the remodeling. 390 thousand tons of cast section were produced at one line of the long product rolling mill last year. Now, it is planned to start from the rod metal production.

One-time metal melting requires about 137 tons of scrap. 14.5 thousand tons of raw materials have already been delivered. Also, the management continues to sign contracts for the scrap metal delivery.

For the reference, the enterprise was nationalized in January of this year.

 

 

Также в рубрике

05/17/24 19:15
Tiraspol proposed signing a declaration of commitment to peaceful methods of conflict resolution
05/16/24 13:50
A resident of Bendery Irina Plagova has been working on the problem of homeless animals. She runs the center for a decade and a half. This is a public organization that takes practical measures to solve problems associated with stray four-legged animals.